ALL Sewer Rehabilitation Works in Ward 5 for 2018

Posted in Construction Notices, Ward 5

 

 

This is a list of sewer rehab work locations and a summary of information for ward 5 in 2018.

[READ] General Summary of Locations & Information 

[READ] Trenchless Inspection & Cleaning of Sewer Laterals on Fieldway Rd.  

[READ] Trenchless Structural Lining of Sewer Laterals on Glenaden Ave. E. 

[READ] Trenchless Structural Lining of Sewer Laterals on Ballacaine Dr. 

[READ] Trenchless Structural Lining of Sewer Laterals on Shand Ave. 

[READ] Sewer Main Repair by Open-Cut Method on Lothian Ave. 

[READ] Sewer Main Repair by Open-Cut Method on Shand Ave. 

[READ] Trenchless Spot Repair of Sewer Main on Ambleside Ave. 

[READ] Trenchless Spot Repair of Sewer Main on Dundas St. W. 

[READ] Trenchless Spot Repair of Sewer Main on Dundas St. W. (2) 

[READ] Trenchless Spot Repair of Sewer Main on Lothian Ave.

[READ] Trenchless Spot Repair of Sewer Main on Shaver Ave. S. 

[READ] Trenchless Structural Lining of Storm Sewer on Bloor St. W (Easement) from 2943A Bloor Street West to 2947A Bloor Street West 

[READ] Proximity Notice – Storm Sewer Rehabilitation on Bloor St. W (Easement) from 2943A Bloor Street West to 2947A Bloor Street West